Reduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop.

dc.barcode010091
dc.classnoMTM TH-0022 THA
dc.contributor.advisorArora, Nilesh
dc.contributor.advisorIyengar, Shreekant
dc.contributor.authorThacker, Jekin
dc.date.accessioned2020-09-10T10:49:54Z
dc.date.available2020-09-10T10:49:54Z
dc.date.issued2012
dc.identifier.urihttp://hdl.handle.net/20.500.12725/9640
dc.pagesiii,81p.
dc.titleReduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop.

Files