Reduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop.
dc.barcode | 010091 | |
dc.classno | MTM TH-0022 THA | |
dc.contributor.advisor | Arora, Nilesh | |
dc.contributor.advisor | Iyengar, Shreekant | |
dc.contributor.author | Thacker, Jekin | |
dc.date.accessioned | 2020-09-10T10:49:54Z | |
dc.date.available | 2020-09-10T10:49:54Z | |
dc.date.issued | 2012 | |
dc.identifier.uri | http://hdl.handle.net/20.500.12725/9640 | |
dc.pages | iii,81p. | |
dc.title | Reduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop. |